HAE
Portfolio · Established 1955

Our

projects

Seven decades of first-grade engineering across every discipline in Jordan.

154
Projects Completed
Published portfolio
12
Featured Highlights
Curated selection
70+
Years Active
Since 1955
6+
Project Types
Across Jordan
Featured Work

Key
Projects

Landmark projects spanning Jordan's most demanding engineering disciplines — seven decades of excellence.

12 Projects
Hover a project
Location
Year
Hallabat Well Field Transmission Pipeline Water 2024
Zarqa · 2024
Hallabat Well Field Transmission Pipeline
Construction of Al- Hajja Saada Al Baddad Mosque and Private Islamic Graveyard, Jordan Buildings 2024
Tal Al Rumman · 2024
Construction of Al- Hajja Saada Al Baddad Mosque and Private Islamic Graveyard, Jordan
Husseini Mosque Renovation Buildings 2024
Amman · 2024
Husseini Mosque Renovation
The Construction of HLP Dewatering Unit Industrial 2023
Ghour Safi · 2023
The Construction of HLP Dewatering Unit
Rehabilitation of Zara Ma'in Water System Post RO Treatment Bypass Facilities Water 2023
Zara Maen · 2023
Rehabilitation of Zara Ma'in Water System Post RO Treatment Bypass Facilities
Construction, Completion and Remedying Defects Works of APC New Red Potash Warehouse in Aqaba - PK1 - Unloading Station -1 Industrial 2022
Aqaba · 2022
Construction, Completion and Remedying Defects Works of APC New Red Potash Warehouse in Aqaba - PK1 - Unloading Station -1
Water 2022
Tafileh · 2022
Construction of Tafileh Wastewater Treatment Plant
Projects DescriptionProject Power PointWater & WastewaterTafilah WWTP.pptm
Roll-out projects for the Energy Efficiency in public Buildings in Jordan _EEPB Ministry of Public Works and Housing Electromechanical 2021
Jordan · 2021
Roll-out projects for the Energy Efficiency in public Buildings in Jordan _EEPB Ministry of Public Works and Housing
Design, Construction & Commissioning of  Supervisory Control and Data Acquisition (SCADA) System  For Amman and Madaba FARA 9 Electromechanical 2021
Amman and Madab · 2021
Design, Construction & Commissioning of Supervisory Control and Data Acquisition (SCADA) System For Amman and Madaba FARA 9
Projects DescriptionProject Power PointWater & WastewaterFARA 9.pptx
Wadi Shallalah Wastewater Treatment Plant and Effluent Reuse Facilities Package #1 Water 2016
Irbid · 2016
Wadi Shallalah Wastewater Treatment Plant and Effluent Reuse Facilities Package #1
Projects DescriptionProject Power PointWater & WastewaterWastewater Treatment Plant Effluent Reuse C1.pptx
Marsa Zayed Phase1 Development Project Infrastructure 2013
Aqaba · 2013
Marsa Zayed Phase1 Development Project
Projects DescriptionProject Power PointRoads & BridgesMarsa Zayed.ppt
Infrastructure 1999
Amman · 1999
Infrastructure of Abu-Nusair Housing Project
Active Work

Ongoing
Projects

8 Projects
Water
Design, Build and Operate of the Northeast Balqa WWTP
AL-Balqa
Water
Construction of bani Kenanah Water Supply System - Package A
Irbid
Water
C2 – Strengthening and restructuring of the Ramtha City and suburbs water distribution networks
Ramtha
Water
Smart Utility Transformation Project
Jordan
Water
Construction of Ramtha Wastewater Treatment Plant Expansion
Ramtha
Water
Dair Alla & Karamah Water Supply System Project-Package 5
Al-Karameh
Water
Rehabilitation and Operation of Abu Ezzighan RO Water Desalinaton Plant
Al-Karameh
Complete Portfolio

All
Projects

58 Projects

No projects match your search.

Hallabat Well Field Transmission Pipeline Water
Hallabat Well Field Transmission Pipeline
Zarqa 2024
Construction of Al- Hajja Saada Al Baddad Mosque and Private Islamic Graveyard, Jordan Buildings
Construction of Al- Hajja Saada Al Baddad Mosque and Private Islamic Graveyard, Jordan
Tal Al Rumman 2024
Husseini Mosque Renovation Buildings
Husseini Mosque Renovation
Amman 2024
The Construction of HLP Dewatering Unit Industrial
The Construction of HLP Dewatering Unit
Ghour Safi 2023
Rehabilitation of Zara Ma'in Water System Post RO Treatment Bypass Facilities Water
Rehabilitation of Zara Ma'in Water System Post RO Treatment Bypass Facilities
Zara Maen 2023
Expansion and Renovation of Bank ABC (Jordan) headquarters Project Package No.3 Main Building Works Buildings
Expansion and Renovation of Bank ABC (Jordan) headquarters Project Package No.3 Main Building Works
Amman 2023
The Construction of HLP Stone Removal Unit Industrial
The Construction of HLP Stone Removal Unit
Ghour Safi 2023
Construction, Completion and Remedying Defects Works of APC New Red Potash Warehouse in Aqaba - PK1 - Unloading Station -1 Industrial
Construction, Completion and Remedying Defects Works of APC New Red Potash Warehouse in Aqaba - PK1 - Unloading Station -1
Aqaba 2022
Roll-out projects for the Energy Efficiency in public Buildings in Jordan _EEPB Ministry of Public Works and Housing Electromechanical
Roll-out projects for the Energy Efficiency in public Buildings in Jordan _EEPB Ministry of Public Works and Housing
Jordan 2021
Design, Construction & Commissioning of  Supervisory Control and Data Acquisition (SCADA) System  For Amman and Madaba FARA 9 Electromechanical
Design, Construction & Commissioning of Supervisory Control and Data Acquisition (SCADA) System For Amman and Madaba FARA 9
Amman and Madab 2021
Construction of an administrative and logistical hub in El Ruweishid, Jordan Buildings
Construction of an administrative and logistical hub in El Ruweishid, Jordan
El Ruweished 2021
Rehabilitation work of the old internal building in Al-Bashir Hospitals and its development as an intensive care building Buildings
Rehabilitation work of the old internal building in Al-Bashir Hospitals and its development as an intensive care building
Amman 2020
Energy Efficiency Improvement in the Jordanian Water Sector (Phase2) Component Rehabilitation of Pump Stations – Lot P2 Water
Energy Efficiency Improvement in the Jordanian Water Sector (Phase2) Component Rehabilitation of Pump Stations – Lot P2
Jordan 2019
Energy Efficiency Improvement in the Jordanian Water Sector (Phase2) Component Rehabilitation of Pump Stations – Lot P1 Water
Energy Efficiency Improvement in the Jordanian Water Sector (Phase2) Component Rehabilitation of Pump Stations – Lot P1
Jordan 2019
Pilots Project for Energy Efficiency in Public Buildings in Jordan – EEPB Electromechanical
Pilots Project for Energy Efficiency in Public Buildings in Jordan – EEPB
Jordan 2019
Energy Efficiency Improvement in the Jordanian Water Sector (Phase2) Component Rehabilitation of Pump Stations – Lot P3 Water
Energy Efficiency Improvement in the Jordanian Water Sector (Phase2) Component Rehabilitation of Pump Stations – Lot P3
Jordan 2019
Saraya Aqaba – Zone R1 Buildings
Saraya Aqaba – Zone R1
Aqaba 2019
Water Transmission Pipeline from Khaw PS to Za'atry PS Water
Water Transmission Pipeline from Khaw PS to Za'atry PS
Zarqa 2018
Rehabilitation of Yadoudeh DZ- 33 Water
Rehabilitation of Yadoudeh DZ- 33
Amman 2018
Construction Site for JTAC Simulator in Jordan Buildings
Construction Site for JTAC Simulator in Jordan
Zarqa 2017
Wadi Shallalah Wastewater Treatment Plant and Effluent Reuse Facilities Package #1 Water
Wadi Shallalah Wastewater Treatment Plant and Effluent Reuse Facilities Package #1
Irbid 2016
Contract 5: Zarqa High and Batrawi East Water Networks Restructuring and Rehabilitation Water
Contract 5: Zarqa High and Batrawi East Water Networks Restructuring and Rehabilitation
Zarqa 2016
Package (1) Design, Construction and Commissioning of Um Elulu- Jerash and Hofa-Ajloun System Facilities Water
Package (1) Design, Construction and Commissioning of Um Elulu- Jerash and Hofa-Ajloun System Facilities
Jerash & Ajloun 2016
Reuse of Treated Wastewater for Irrigation Purposes in the Northern Jordan Valley - Package 3 Water
Reuse of Treated Wastewater for Irrigation Purposes in the Northern Jordan Valley - Package 3
Northern Jordan Valley 2016
Upgrade of Mafraq Wastewater Treatment Plant - Reuse System Water
Upgrade of Mafraq Wastewater Treatment Plant - Reuse System
Mafraq 2016
Contract 3: Russaifah Low Water Networks Restructuring and Rehabilitation Water
Contract 3: Russaifah Low Water Networks Restructuring and Rehabilitation
Zarqa 2015
Disi Mudawara to Amman Water Conveyance System (35) Water
Disi Mudawara to Amman Water Conveyance System (35)
Al Mudawara 2013
Samarah Dead Sea Project Villas, Mall, Swimming Pool & Drainage Buildings
Samarah Dead Sea Project Villas, Mall, Swimming Pool & Drainage
Dead Sea 2013
Marsa Zayed Phase1 Development Project Infrastructure
Marsa Zayed Phase1 Development Project
Aqaba 2013
Galleria  Mall –Electromechanical Works Electromechanical
Galleria Mall –Electromechanical Works
Amman 2013
Disi Mudawara to Amman Water Conveyance System (36) Water
Disi Mudawara to Amman Water Conveyance System (36)
Al Mudawara 2013
Galleria  Mall –  Skelton Works Buildings
Galleria Mall – Skelton Works
Amman 2012
Samara Resorts Dead Sea / Buildings D, E & F and Landscape Works Buildings
Samara Resorts Dead Sea / Buildings D, E & F and Landscape Works
Dead Sea 2012
Al Dirreh Land Borders Crossing Roads Phase 1 Roads, Bridges & Tunnels
Al Dirreh Land Borders Crossing Roads Phase 1
Aqaba 2012
Water Supply System in Humaemeh Water
Water Supply System in Humaemeh
Aqaba 2010
Irbid Wastewater & Pump Station for Natifa & Docarah Water
Irbid Wastewater & Pump Station for Natifa & Docarah
Irbid 2008
Construction of Madaba / Na'or / Um-Al'amad Road Roads, Bridges & Tunnels
Construction of Madaba / Na'or / Um-Al'amad Road
Madaba 2007
Tawfeeq Al-Tabba’ & Al-Shoura Interchange Roads, Bridges & Tunnels
Tawfeeq Al-Tabba’ & Al-Shoura Interchange
Amman 2007
Abdoun Tunnel Roads, Bridges & Tunnels
Abdoun Tunnel
Amman 2006
Prince Ghazi Intersection Roads, Bridges & Tunnels
Prince Ghazi Intersection
Amman 2006
RH Prince Hamzeh Hospital Buildings
RH Prince Hamzeh Hospital
Amman 2004
Construction of Bacalorea Intersection Tunnel Roads, Bridges & Tunnels
Construction of Bacalorea Intersection Tunnel
Amman 2004
Restructuring of Greater Amman Water Supply System - Contract 9 Water
Restructuring of Greater Amman Water Supply System - Contract 9
Amman 2003
Restructuring of Greater Amman Water Supply System - Contract-2 Water
Restructuring of Greater Amman Water Supply System - Contract-2
Amman 2002
Rehabilitation of Prophet Sho’ayb Shrine Buildings
Rehabilitation of Prophet Sho’ayb Shrine
Salt 2002
Construction of Ministry of Health General Stores & Work Shop Buildings
Construction of Ministry of Health General Stores & Work Shop
Zarqa 1999
Olympic Swimming Pool Buildings
Olympic Swimming Pool
Amman 1999
Construction of Urology Unit at Al-Hussein Medical City Buildings
Construction of Urology Unit at Al-Hussein Medical City
Amman 1999
Al-Shaheed Intersection Tunnel Roads, Bridges & Tunnels
Al-Shaheed Intersection Tunnel
Amman 1999
Kafrain - Dead Sea Water Pipeline Project Water
Kafrain - Dead Sea Water Pipeline Project
Dead Sea 1999
Rehabilitation of Tal Al- Thahab Weir Water
Rehabilitation of Tal Al- Thahab Weir
Irbid 1999
F 16 Facilities /Muafaq Salti Air Base Buildings
F 16 Facilities /Muafaq Salti Air Base
Mafraq 1998
Extension of Intercontinental Hotel Buildings
Extension of Intercontinental Hotel
Amman 1998
H.M. King Talal Intersection Twin Tunnel Roads, Bridges & Tunnels
H.M. King Talal Intersection Twin Tunnel
Amman 1997
Upgrading and Expansion of the Water System at Salt City Water
Upgrading and Expansion of the Water System at Salt City
Salt 1997
Faculty of Educational Science Buildings
Faculty of Educational Science
Amman 1995
Faculty of Educational Science Buildings
Faculty of Educational Science
Amman 1995
Lib Pumping Station Water
Lib Pumping Station
1992
Complete portfolio

Additional entries

Project Type Location Client Year Status
Upgrade Khaw Abu-Alanda phase (II) Water Amman Jordan Water Company (Miyahuna) 2026 Completed
Supply, Install, and Commission Pressure Management System Water Amman Jordan Water Company (Miyahuna) 2026 Completed
Upgrade Khaw Pump Station Water Zarqa Jordan Water Company (Miyahuna) 2026 Completed
ممستشفى المملكة التابع لشركة الصندوق السعودي الاردني للاستثمارات الطبية والتعليمية وادارة الاصول – الحزمة الثانية: أعمال الحفريات والهيكل الانشائي Buildings Amman شركة الصندوق السعودي الاردني للاستثمارات الطبية والتعليمية وادارة الاصول 2025 Completed
SJFMEIAMC Healthcare and Educational Project – Package 02 – Enabling, Excavation and Skeleton Works. Buildings Amman Saudi Jordanian Fund for Medical and Educational Investments and Asset Management Company 2025 Completed
Complementary Work for Network Rehabilitation of As-Salt Downtown (Naqab Swada) Water Salt Ministry of Water & Irrigation - Water Authority of Jordan 2025 Completed
South Amman WWTP RAW Wastewater Storage Pond and Additional Diversion Chambers Works Water Amman Jordan Water Company (Miyahuna) 2024 Completed
اعمال مبنى الادارة العامة الجديد وتحديث مبنى الادارة القائم - بنك المؤسسة العربية المصرفية (الاردن) Buildings Amman بنك المؤسسة العربية المصرفية 2023 Completed
Driving Training Project Roads, Bridges & Tunnels Amman KASOTC 2023 Completed
انشاء وتنفيذ ميادين قيادة الاليات Roads, Bridges & Tunnels Amman شركة كاسوتك لتدريب العملبات الخاصة 2023 Completed
Water Sector Infrastructure Project (WSIP) /Amman Improvement Phase III/ Package (2): Miscellaneous Water Networks in Amman Water Amman Ministry of Water & Irrigation - Water Authority of Jordan 2023 Completed
توريد وتمديد خط 600 ملم ستيل في شارع المطار عند كازية بلازا Water Amman Jordan Water Company (Miyahuna) 2022 Completed
Construction of Tafileh Wastewater Treatment Plant Water Tafileh Ministry of Water & Irrigation - Water Authority of Jordan 2022 Completed
Restructuring & Rehabilitation of DZ-28, Water Supply Network Water Amman Jordan Water Company (Miyahuna) 2021 Completed
Restructuring & Rehabilitation of DZ-04, DZ-05, DZ-18, Water Supply Network Water Amman Jordan Water Company (Miyahuna) 2021 Completed
تنفيذ المبنى الاداري واللوجيستي في الرويشد Buildings الرويشد الوكالة الفرنسية للخبرة الفنية الدولية 2021 Completed
Construction of Amman Bus Rapid Transit (BRT) Project - Package 8 and 9B (Omar Matar Street) and Package 9A (Fountain Square Terminal Station) Roads, Bridges & Tunnels Amman Greater Amman Municipality 2021 Completed
Bridge 4 Rehabilitation Works – Sweimwh – Zara Road /Dead Sea Roads, Bridges & Tunnels Dead Sea Ministry of Public Works & Housing 2020 Completed
Extension & Rehabilitation of Wastewater Collection System in Mafraq City Water Mafraq Ministry of Water & Irrigation - Water Authority of Jordan 2019 Completed
اعادة تاهيل شبكات المياه في منطقة اليادودة Water Amman شركة مياه الاردن - مياهنا 2018 Completed
Construction of East Jerash Wastewater Treatment Plant Water Jarash Ministry of Water & Irrigation - Water Authority of Jordan 2018 Completed
Contract 6: Construction of Basateen Pump Station and Reservoir Water Basateen Ministry of Water & Irrigation - Water Authority of Jordan 2016 Completed
Wastewater Treatment Plant and Effluent Reuse Facilities (C-1) Extra Works (Optional Items Water Al-Mafraq Ministry of Water & Irrigation - Water Authority of Jordan 2016 Completed
محطة تنقية الشلالة (الأعمال الإضافية) Wastewater Irbid وزارة المياه والري - سلطة المياه 2016 Completed
Water Supply Network Project in Za’atari Camp – Phase 1 Water Zaatari Camp ACTED 2015 Completed
تمديد شبكات المياه في مخيم الزعتري – المرحلة الاولى Water الزعتري وكالة التعاون التقني والتنمية ACTED 2015 Completed
Installation of House Connections - Jordan Water Company (Miyahuna) Project Water Amman Jordan Water Company (Miyahuna) 2015 Completed
مشروع سمارة للشقق: مباني سكنية ومول تجاري ونماذج فلل وبرك سباحة و محطة معالجة مياه الصرف الصحي Buildings غور الصافي شركة البحر الميت للاستثمارات السياحية والعقارية 2013 Completed
المرحلة الاولى – مرسى زايد Infrastructure Aqaba شركة المعبر للاستثمار 2013 Completed
مشروع جاليريا مول / أعمال الكهروميكانيك Electromechanical Amman شركة الياقوات العقارية 2013 Completed
AL-Alamiyyeh Sewer Project Aqaba Water Company 2013 Completed
مشروع العالمية للصرف الصحي Wastewater Aqaba شركة مياه الاردن - مياهنا 2013 Completed
جاليريا مول - أعمال الهيكل Buildings Amman شركة الياقوات العقارية 2012 Completed
مشروع سمارة البحر الميت: منتجع سمارة البحر الميت، مباني F,E,D والبنية التحتية Buildings غور الصافي شركة البحر الميت للاستثمارات السياحية والعقارية 2012 Completed
Saden Complex Buildings Amman Al Asbat Al Aqaria 2012 Completed
مجمع سادن Buildings Amman الاسباط العقارية 2012 Completed
Shmeissani – Abdali Interchange Roads, Bridges & Tunnels Amman Greater Amman Municipality 2012 Completed
Infrastructure and Landscape – Jordan-German University Infrastructure Madaba Jordan- German University 2010 Completed
Street Rehabilitation, Furnishing, Landscaping and Building Surveys for the Historic City of Jarash Infrastructure Jarash Ministry of Tourism 2010 Completed
إعادة تأهيل الشوارع والبنية التحتية والساحات العامة في وسط مدينة جرش Infrastructure Jarash وزارة السياحة والاثار 2010 Completed
نظام التزويد بمياه منطقة الحميمة Water Aqaba شركة مياه العقبة 2010 Completed
Zaki Al Goul Project Buildings Amman Mr. Zaki Al Goul 2010 Completed
مشروع زكي الغول Buildings Amman السيد زكي الغول 2010 Completed
Saceb & Remon WasteWater Water Jarash Ministry of Water & Irrigation - Water Authority of Jordan 2009 Completed
Wastewater Collection Systems for South East Irbid Water Irbid Ministry of Water & Irrigation - Water Authority of Jordan 2009 Completed
Emmar Towers Buildings Amman Emmar for Land development & investment 2008 Completed
أبراج إعمار Buildings Amman شركة إعمار للتطوير والاستثمار العقاري 2008 Completed
Jordan National Financial Center Project-Excavation Excavation Amman Jordan Securities Commission 2008 Completed
Saied Khair Tunnel Roads, Bridges & Tunnels Amman Greater Amman Municipality 2008 Completed
South Amman Gate Exchange -Jerash Roads, Bridges & Tunnels Jarash Ministry of Tourism & Antiquities 2007 Completed
بوابه جنوب عمان / جرش Roads, Bridges & Tunnels Jarash وزارة السياحة والاثار 2007 Completed
Ain Al-Basha Intersection Roads, Bridges & Tunnels Amman Ministry of Public Works & Housing 2007 Completed
مشروع تقاطع الشورى والطباع Roads, Bridges & Tunnels Amman امانة عمان الكبرى 2007 Completed
Zara Maeen Water Project Water Zara Maen Ministry of Water & Irrigation - Water Authority of Jordan 2006 Completed
مياه وادي ماعين والزارا والموجب Water زارا ماعين وزارة المياه والري - سلطة المياه 2006 Completed
Arab Bank Central Operation Unit – COU Project Buildings Amman Arab Bank plc. 2005 Completed
مبنى البنك العربي- طريق المطار Buildings Amman البنك العربي 2005 Completed
Construction of North Abu-Nusair Tunnel Roads, Bridges & Tunnels Amman Greater Amman Municipality 2004 Completed
Construction of Jubaiha Entertainment Intersection Tunnel Roads, Bridges & Tunnels Amman Greater Amman Municipality 2004 Completed
Rehabilitation of Greater Amman Water Network (Contract 4) Water Amman Ministry of Water & Irrigation - Water Authority of Jordan 2004 Completed
Mu’tah University Sewage Treatment Plant Stage II Water Karak Mu’tah University Campus 2003 Completed
Re-Establishment of Water Supply to the Capital of Amman Water Amman Ministry of Water & Irrigation - Water Authority of Jordan 2002 Completed
إعادة إنشاء نظام تزويد العاصمة عمان بالمياه Water Amman وزارة المياه والري - سلطة المياه 2002 Completed
Al-Hussein Cultural Center Buildings Amman Greater Amman Municipality 2002 Completed
إعادة تأهيل ضريح النبي شعيب Buildings السلط اللجنة الملكية لاعمار مقامات الانبياء والصحابة 2002 Completed
مركز الحسين الثقافي Buildings Amman امانة عمان الكبرى 2002 Completed
Queen Alia Street Tunnel Roads, Bridges & Tunnels Amman Greater Amman Municipality 2001 Completed
إنشاء نفق على تقاطع شارع الملكة علياء (نفق السيفوي) Roads, Bridges & Tunnels Amman امانة عمان الكبرى 2001 Completed
Construction of Wadi Mousa Bridge Roads, Bridges & Tunnels Wadi Mousa Ministry of Public Works & Housing 2001 Completed
Kafrain Water Supply Project Water Kafrain Ministry of Water & Irrigation - Water Authority of Jordan 2001 Completed
Construction of Army Street- South Hashmi Car Tunnel Roads, Bridges & Tunnels Amman Greater Amman Municipality 1999 Completed
إنشاء نفق الهاشمي الجنوبي Roads, Bridges & Tunnels Amman امانة عمان الكبرى 1999 Completed
إنشاء مبنى اللوازم والمستودعات والمشاغل /وزارة الصحة Buildings Zarqa وزارة الاشغال العامة والاسكان 1999 Completed
Infrastructure of Abu-Nusair Housing Project Infrastructure Amman Ministry of Public Works & Housing 1999 Completed
North-East Irbid Waste Water Pumping Station Project Water Irbid Ministry of Water & Irrigation - Water Authority of Jordan 1999 Completed
Jaber Waste Water Treatment Plant Water Syrian Border Ministry of Water & Irrigation - Water Authority of Jordan 1999 Completed
مشروع محطة جابر لمعالجة المياه العادمة Wastewater الحدود السورية وزارة المياه والري - سلطة المياه 1999 Completed
نفق تقاطع الشهيد Roads, Bridges & Tunnels Amman امانة عمان الكبرى 1999 Completed
قاعدة موفق السلطي الجوية (F16) Buildings المفرق سلاح الجو الملكي الأردني 1998 Completed
توسعة فندق الانتركونتيننتال Buildings Amman شركة زارة للاستثمار القابضة 1998 Completed
إنشاء نفقين على تقاطع الملك طلال (الدوار الثالث) Roads, Bridges & Tunnels Amman امانة عمان الكبرى 1997 Completed
إنشاء كلية العلوم التربوية في الجامعة الأردنية Buildings Amman الجامعة الاردنية 1995 Completed
Operation and maintenance of a wastewater purification plant in the Swaqa Repair and Rehabilitation Center Water Amman Public Security Directorate 1992 Completed
Operation and maintenance of a wastewater purification plant in the Umm Lulu Repair and Rehabilitation Center Water Ajloun Public Security Directorate 1992 Completed
Establishment and development of the Public Security Officers Club Buildings Amman Public Security Directorate 1992 Completed
Center for National Security and Crisis Management Buildings Public Security Directorate 2026 Completed
Work with us

Have a project in mind?

Get in Touch